What mods need to be made to put a 100 series Phase II tool post on a porper model B? I know you need to machine the nut that they provide but is there any other mods needed? Specifically I am wondering if you need to add a spacer the get the height correct on the tool post, if so how much of a spacer.
Thanks for the info.
Thanks for the info.