dendweller
Well-known member
I've got a container of the RKC contact cement. Doesn't give much for instructions on the can.
Should I assume you use it like you'd use weldwood? In other words, put it on both surfaces, wait for it to glaze over (15 minutes or so) and attach.
Also, what are the temperature requirements? Weldwood says parts should be in at least 65 degrees for 24 hours before and after bonding.
Thanks
Should I assume you use it like you'd use weldwood? In other words, put it on both surfaces, wait for it to glaze over (15 minutes or so) and attach.
Also, what are the temperature requirements? Weldwood says parts should be in at least 65 degrees for 24 hours before and after bonding.
Thanks