I am getting ready to put my slate on the table i purchased. It was held down with 2 inch #12 screws. These screws dont go all the way through the wood carry beams. I was thinking that it might be better or easier to level if i used machine fine thread bolts and nuts and pre drill through the wood.
Any reason no to do this? any advantage to it?
Any reason no to do this? any advantage to it?