I have no experience with a brunswick coin-op. 1 pc slate i'm assuming? I'm not wondering about the mechanics just whether its a 2 man job to move a 7fter. Are they like 7ft. valleys or heavier or lighter? Table is in basement and going into another basement with the normal 12-15 steps at both locales. I'm trying to qoute it as 2 man, 3 man or 4 man job. Any help would be greatly appreciated. btw in this situation with the steps involved a 7ft. valley would be a 4 man job.(for us anyway) A 7ft. fisher would be a 3 man job.