cueporn
Banned
FS/FT Acme 1/2"-10 tpi 37 inch long lead screw. I built a lathe using a pinion drive powerfeed so I don't need this. I will sell it for $25 delivered in the CONUS.
Will entertain trades for any cuebuilding tools; taps, maintenance pins... or cue components; pins, inserts, tips,.... I need everything, please pm offers.
Pictures coming, trouble downloading. I can send them by email or to your cell. I will get them posted here eventually.
Will entertain trades for any cuebuilding tools; taps, maintenance pins... or cue components; pins, inserts, tips,.... I need everything, please pm offers.
Pictures coming, trouble downloading. I can send them by email or to your cell. I will get them posted here eventually.
Last edited: