I have a need for a 14 team schedule in which no team is either home or away more than 2 weeks in a row. In addition I have 5 locations with 2 teams each but only 1 pool table per location so those teams would also not be able to be at home at the same time. Can someone create a schedule in excel or some other format to help me out.
You can email the schedule to me at kevinlindstrom@msn.com
Thank you in advance.
Kevin
You can email the schedule to me at kevinlindstrom@msn.com
Thank you in advance.
Kevin