I have 3 IIIs and a I. Mechanics seem inept. I have seen specific directions from Brunswick some where. Can someone direct me??
rikdee said:Or, allowing the feet to seek the floor, level (shim) the base frame to the stretcher. This was always my preferred method.
rikdee said:Or, allowing the feet to seek the floor, level (shim) the base frame to the stretcher. This was always my preferred method.
rikdee said:I agree, Glen. Having a solidly levelled base frame can save a lot of shims when the slated are installed. I always enjoyed the very heavy duty hardware that came with the GCI stretcher / baseframe. That thing was solid.