The time for after the New Year holidays repairs

DBK

AzB Silver Member
Silver Member
January and February - the busiest time for repairs :). Many cues suffered during the Christmas billiard battles ;). It has to be repaired. Therefore I was absent.
For example, it is unclear how it was possible to break the cue in small chips :yikes: :grin:. But this cue will live.:smile:

IMG_3868_zps275ea9dc.jpg~original

IMG_3869_zpsbad42354.jpg~original


But I do not lose time in vain. Is gradually build orders, such as this one.

IMG_3867_zpsd0670f06.jpg~original


And this bunch of blanks will soon be full splice.

IMG_3861_zps404a872c.jpg~original


All good luck :)
 
Thank U.:)
Blue one will most likely be a bit later, in the second group of blanks. But in the first part I plan green.:wink:
 
Back
Top