Getting close to putting it all together. All painted, polished, cloth, now is when the rubber hits the road.
Once I get the base centered in the room I'll place and bolt down the superstructure that sits between the slate and the base. I will then level the base before adding the slate.
I am lucky my floor is concrete slab. My table is an older GC1 and does have adjustable feet.
once I get my slate on and get each one aligned so that they are all the same height and before I bondo the cracks would you then use the leg levelers to get the table level? I will also use the cue ball roll technique as it does show your high spots.
Any thought or suggestions?
Thank you for your help,
Allen
Once I get the base centered in the room I'll place and bolt down the superstructure that sits between the slate and the base. I will then level the base before adding the slate.
I am lucky my floor is concrete slab. My table is an older GC1 and does have adjustable feet.
once I get my slate on and get each one aligned so that they are all the same height and before I bondo the cracks would you then use the leg levelers to get the table level? I will also use the cue ball roll technique as it does show your high spots.
Any thought or suggestions?
Thank you for your help,
Allen