as i stated on another thread, i was hoping to expand my above the garage apartment, the "Fonzie Pad" as my buddies call it. also was hoping the additional 12 feet would give me plenty of room to have the GCIV moved back upstairs.
my builder, the guy who built the place in 1998, and who is usually the least expensive in this area, told me it probably wouldnt be as much as i thought. so, i was anticipating a lower estimate from him, and was thinking of all the other little things i might have done.
however, he calls and it turned out to be much higher than anticipated. if he would have been 5-6 thousand less, i would give him the go-ahead to start in october. if he would have been around three thousand less........well, i would have had to think about it. but at his price i'd says its most likely a no-go.
anyway, you guys out there that know anything about construction, builders, dealing with this sort of thing..........do you think its worthwhile to call him back and tell him that he's close, if he could come down about 10% i might just go ahead? and if so, how do i politely phrase those comments without offending him? or am i just stuck with his bid and thats it?
thanks for any help,
DCP
my builder, the guy who built the place in 1998, and who is usually the least expensive in this area, told me it probably wouldnt be as much as i thought. so, i was anticipating a lower estimate from him, and was thinking of all the other little things i might have done.
however, he calls and it turned out to be much higher than anticipated. if he would have been 5-6 thousand less, i would give him the go-ahead to start in october. if he would have been around three thousand less........well, i would have had to think about it. but at his price i'd says its most likely a no-go.
anyway, you guys out there that know anything about construction, builders, dealing with this sort of thing..........do you think its worthwhile to call him back and tell him that he's close, if he could come down about 10% i might just go ahead? and if so, how do i politely phrase those comments without offending him? or am i just stuck with his bid and thats it?
thanks for any help,
DCP