Our basement got some flood damage and the flooring needs to be replaced.
The floor guy said one end needs to be lifted about 1/2", replace floor section, set back down. Then do the same with the other end.
Can this be done without screwing the table up? How and where would you lift it?
The floor guy said one end needs to be lifted about 1/2", replace floor section, set back down. Then do the same with the other end.
Can this be done without screwing the table up? How and where would you lift it?