When it's finished it will be a bit nicer. This gallery is just temporary.
I made 21 or 22 last year Chris and was hoping to do 40 or so this year. Since I'm only up to 42 total, I imagine I will end up somewhere in the 30's. I should have 3 or 4 done per month for the rest of the year as long as I don't get lazy. Most of those, I've already shown photos of here in some form or other.
Cue #1 I haven't taken photos of yet, but it was pretty bad. Cue #3 was built in one day and finished with super glue the second. It is still straight, but I don't have much faith in it. Cue #5 (6 pointer) is the first one that I mitered the Veneers. I've only finished two six pointers so far. I just put the last three points in for another 6 long pointer and the points will touch just above the bottom ring as will a lot of the four pointers I'll be starting soon.
I've also had a few of the old cues back here to strip off the super glue and refinish them with Automotive. Every one was still dead straight.
That's about all my rambling for now. Going to have a couple of beers.