In the last few hours since my last post, I’ve taken a couple hundred nails out of the concrete floor and cinder block walls. Floor was done with a claw hammer which made the holes. Wall nails were chopped off at the surface with a grinder. Then I filled all the holes with concrete patch. I will say this rolling knee pad from harbor freight was awesome for this tedious job. Rolled right around the room filling everything in. Tomorrow after work I’ll come back and knock off all the high spots with some sandpaper and move on to something else.
Water heaters get moved on Saturday and hope to get a good bit of framing done as well.
Sent from my iPhone using Tapatalk
Water heaters get moved on Saturday and hope to get a good bit of framing done as well.



Sent from my iPhone using Tapatalk