Thanks to you Sir for posting the above. I have finished installing new super speed rubber for the rails and all looks great. I normally set my tables up , but when this one came along I had it installed, while I was out on the road working. I disassembled it so as to install a new floor and have now
gotten the base set back and awaiting to lay the slate back onto the base frame. Question , I'm so close to level on the base frame now, I loosened the two bolts that that hold the base frame to the legs and installed a couple of 45 records between the frame and the legs (only at one side of the table) and the base frame is spot on level, in every direction,,shold I move on and now finish up , or is it a bad idea to use the base frame to level the table like this? Thanks again