inspired by Runout1961..cause he is rocking it...here is my progress on Billiards room. 3rd floor space, will have several uses, but pics should be of Billiards area only. did almost all the work myself, abut 1 year in - im slow.
I can't imagine the hassle that it must have been, to get that table loaded in the truck, in that manner.where we are today! Table is oriented incorrectly..just there to get out of way. Powder Coating for caps etc this week...should be back in a week...b then I might be ready for table install. Have several local quotes, non seem "stellar" in their knowledge of GC3's. Still lots to do up there in other areas of the 3rd "bonus" floor.
I’m really slow on progress. Parts are off to powder coating. Table tentatively scheduled for 6-7, baseboard in. Test fitted cues in wall holder...need to make bottom piece a little shorter. Will make make framed glass/plexiglass doors - but that’s fiddily work I’m not good at so I’ll procrastinate as long as I can!!!!!!!View attachment 595261View attachment 595262
totally digging the in-wall/recessed cue case/display. (guessing you framed it like that/for it?)