Ok ... so we have fully discussed the shaft cutting time line and I promise that I will never wander off the path of proper cutting and waiting. I have the schedule nailed to the wall over my lathe.
How about the butt??
Lets say you only buy kiln dried pieces and a moisture meter shows 6% to 8% moisture.
What would be an acceptable schedule of turning the squares round, coring them with a laminated maple core, assembling them into a butt, Turning the butt to finished size, and putting on a finish???
Looking for expert advice here..... I have learned my lesson.
thanks
Kim
How about the butt??
Lets say you only buy kiln dried pieces and a moisture meter shows 6% to 8% moisture.
What would be an acceptable schedule of turning the squares round, coring them with a laminated maple core, assembling them into a butt, Turning the butt to finished size, and putting on a finish???
Looking for expert advice here..... I have learned my lesson.
thanks
Kim