I recently got 7 sets of Ridgeback rails to do a pool room we have our league out of and I am using the glue method to do the rails I have got it down to 8 to 10 staples per end and 2 hours and 15 min to cut the Simonis 860 hr and do the rails for 1 table seems long to me my question is for the mechanics that glue these rails how long does it normally take ?
I feel like it should be 6 to 8 minutes a rail but them little things seem so hard to work with to get perfect
Thanks,
Bill
I feel like it should be 6 to 8 minutes a rail but them little things seem so hard to work with to get perfect
Thanks,
Bill