I have seen the photos of veneered box work and wanted to see what it took to do that.
Even with the CNC cutting the pocket and center design the veneers took about an hour to install.
Each one (there are 12) had to be cut, sanded, and fitted by hand one at a time.
I see why those cues bring more money than just CNC inlays.
It takes a lot of hands on work to do one.
Even with the CNC cutting the pocket and center design the veneers took about an hour to install.
Each one (there are 12) had to be cut, sanded, and fitted by hand one at a time.
I see why those cues bring more money than just CNC inlays.
It takes a lot of hands on work to do one.
Last edited: