xX-Wizard-Xx
Well-known member
how long should it take to build 2 shafts to match a butt that has a simple black joint collar?
i sent my cue to a manufacturer to have 2 shafts built for it. the timing was around july 20, 2020. it has been about 1 yr and 2 months. is this normal?
i sent my cue to a manufacturer to have 2 shafts built for it. the timing was around july 20, 2020. it has been about 1 yr and 2 months. is this normal?