My wife, among a myriad of other duties, is required to read reports before they go out. These are zero tolerance error reports. They are reviewed by MBAs before they ever get to her. She reviews typically 100 page reports with graphs, tables and the narrative. She reviews everything, calling out inconsistencies between the narrative and tables and graphs. I typically see at least 20 pages of flags she has on any report.These things KILL me. Not one person from beginning to end of project noticed? Not one?
Good thing there was no scope on that rifle.I never tire of this no matter how many times I tell people.
It's gotta be a 45-70 or something along those lines? Doesn't look very fun to shoot.
Umm... that's the clutch and the brake pedals.