Well, it's been almost 4 months now and I'm starting to see light at the end of the tunnel.
Here is a picture of one of the center legs that were in such bad shape. Each speration in the laminated structure was re-glued with Elmer's wood glue and clamped. Believe it ot not, this worked quite well and all the layers are now solid as can be.
		
		
	
	
		 
	
Here's a picture of the external lamination on one of the center legs after the internal structure had been repaired.
		 
	
And here is a picture of where I'm at right now
		 
	
If everything goes well, we're looking at 3 more weeks or so until she's done. The rails are being redone with new rubber and cloth as we speak. The rails got 7 new ivory sights and a light satin coat of poly. The cloth will be 860 in Simonis green and new pockets all around. I'll post some more pics once she's finished.
Here's a link to my original thread.
http://forums.azbilliards.com/showthread.php?t=170898
Cheers,
RG
				
			Here is a picture of one of the center legs that were in such bad shape. Each speration in the laminated structure was re-glued with Elmer's wood glue and clamped. Believe it ot not, this worked quite well and all the layers are now solid as can be.
 
	Here's a picture of the external lamination on one of the center legs after the internal structure had been repaired.
 
	And here is a picture of where I'm at right now
 
	If everything goes well, we're looking at 3 more weeks or so until she's done. The rails are being redone with new rubber and cloth as we speak. The rails got 7 new ivory sights and a light satin coat of poly. The cloth will be 860 in Simonis green and new pockets all around. I'll post some more pics once she's finished.
Here's a link to my original thread.
http://forums.azbilliards.com/showthread.php?t=170898
Cheers,
RG
 
 
		 
 
		
 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 .
. 
	 
 
		 
	 
 
		 
 
		 
	 
	 
	 
	 
	